Digital Waste Tracking for Landfill Sites Made Easy

Digital waste tracking for landfill sites doesn't have to mean more paperwork. Landfills and treatment facilities are firmly in Phase 1, receiving many waste types under permit limits that regulators will now see load by load. We build a bespoke app around how your business works, so every job, weight and signature is captured once, digital waste transfer notes are sent automatically and your Defra records are submitted on time.

How Digital Waste Tracking for Landfill Sites Works

Landfills and treatment facilities receive many different waste types under tightly defined permit conditions. Under digital waste tracking, regulators can now see what you receive load by load, so your records need to be accurate and consistent with your permit and returns.

Digital waste tracking for landfill sites means capturing each load with the right EWC code, weight and disposal or recovery code at the gate, checking it against your permit, and reporting it to Defra automatically.

Every Load Against Your Permit Limits

Your permit sets which waste codes you can accept and how much. The app holds those limits and checks each load as it's ticketed. Loads with codes your permit doesn't cover are flagged before acceptance, and tonnage totals are tracked against limits, with alerts as you get close.

Disposal and Recovery Codes per Load

Digital waste tracking requires at least one disposal or recovery code for each EWC code on a load, such as D1 for landfill or R5 for recycling inorganic materials. The app sets the correct default codes for each waste stream and route on your site, so gatehouse staff don't have to remember them, while allowing changes where a load is treated differently.

Landfill Tax and Waste Returns Alignment

The same load data supports your landfill tax records and your waste returns. Because tonnages, waste codes and treatment routes are all recorded consistently, the figures in your tax records, waste returns and Defra submissions line up, which is exactly what auditors want to see.

When Landfill and Treatment Sites Must Comply

Landfills and treatment facilities are permitted receiving sites, so Phase 1 applies: mandatory from 1 October 2026 in England and Wales and 1 January 2027 in Scotland and Northern Ireland.

EWC Codes and Records for Landfill and Treatment Sites

Codes vary widely by site, but common ones include:

17 05 04soil and stones
19 12 12other wastes from mechanical treatment
20 03 01mixed municipal waste
17 09 04mixed construction and demolition waste

Hazardous waste cells and treatment processes will add many more. Always confirm codes against the official List of Wastes and your permit.

A Bespoke App for Landfill and Treatment Sites

A landfill or treatment site app can include:

Gatehouse and weighbridge ticketing

with permit checks

Default disposal and recovery codes

by stream

Waste acceptance and rejection

records

Tonnage tracking

against permit limits

Landfill tax and waste return reports

Automatic Defra digital waste tracking

From Paper to Digital Without the Headache

We can work alongside your existing weighbridge system or replace manual processes, starting with permit checks and Defra reporting.

Frequently Asked Questions

Yes. They're permitted receiving sites in Phase 1.

Related

We don't sell boxes of software. We build the app your business actually needs.

Book a free, no-obligation demo and talk it through with someone who understands commercial waste management.

Book a free demo