Digital Waste Tracking for Biomass Made Easy

Digital waste tracking for biomass doesn't have to mean more paperwork. Biomass plants and waste wood processors receive graded wood every day, and each load must now be reported through digital waste tracking. We build a bespoke app around how your business works, so every job, weight and signature is captured once, digital waste transfer notes are sent automatically and your Defra records are submitted on time.

How Digital Waste Tracking for Biomass Works

Biomass plants and waste wood processors take in graded wood from collectors, recyclers and construction sites every day. Each delivery is a receipt of waste, and sites operating under environmental permits now report every load to Defra within 2 working days.

Digital waste tracking for biomass means recording each delivery with its supplier, carrier, wood grade, EWC code and weight at the gate, and linking it to your fuel supply and sustainability records. Our app does both in one system.

Waste Wood Grades Recorded at the Gate

Waste wood is usually graded from A, clean wood, through to D, hazardous wood such as treated timbers. The grade affects where it can go and how it's coded. Gatehouse staff record the grade, take photos and note contamination for each delivery. Rejected or downgraded loads are recorded with a reason, and the supplier is told straight away.

Supply Chain Evidence for Biomass

Biomass operators often need to evidence where their fuel came from, for sustainability schemes, customers or regulators. The app links each delivery to its supplier and origin, so you can produce supply chain reports by supplier, grade and period whenever you need them.

Onward Fuel and Chip Movements

When wood is processed into chip or fuel and sent on, the app records each outgoing load and its destination, keeping mass balance between what came in and what went out. That helps you meet certification requirements and makes stock management straightforward.

When Biomass and Waste Wood Sites Must Comply

Biomass and waste wood sites operating under environmental permits are in Phase 1: mandatory from 1 October 2026 in England and Wales and 1 January 2027 in Scotland and Northern Ireland. If you run your own collection vehicles, those movements are planned for Phase 2 from October 2027.

EWC Codes and Records for Biomass and Waste Wood Sites

Common codes for waste wood include:

19 12 07wood (other than hazardous wood)
17 02 01wood (construction and demolition)
15 01 03wooden packaging
20 01 38wood (municipal)
03 01 05sawdust, shavings and cuttings

Hazardous wood has its own codes. Always confirm codes against the official List of Wastes.

A Bespoke App for Biomass and Waste Wood Sites

A biomass and waste wood app can include:

Gatehouse and weighbridge receipts

with grades and photos

Supplier records

and supply chain reporting

Rejections and downgrades

with evidence

Stock and mass balance

by grade

Outgoing fuel and chip movements

Automatic Defra digital waste tracking

From Paper to Digital Without the Headache

If your deliveries are recorded on paper tickets or a spreadsheet, we can move you onto a gatehouse app quickly, starting with Defra reporting and adding supply chain and stock modules.

Frequently Asked Questions

Yes, if they operate under environmental permits and receive waste wood.

Related

We don't sell boxes of software. We build the app your business actually needs.

Book a free, no-obligation demo and talk it through with someone who understands commercial waste management.

Book a free demo