Digital Waste Tracking for Anaerobic Digestion Made Easy

Digital waste tracking for anaerobic digestion doesn't have to mean more paperwork. Anaerobic digestion and composting sites are permitted receiving sites, so Phase 1 digital waste tracking applies to every feedstock load received. We build a bespoke app around how your business works, so every job, weight and signature is captured once, digital waste transfer notes are sent automatically and your Defra records are submitted on time.

How Digital Waste Tracking for Anaerobic Digestion Works

Anaerobic digestion plants and composting sites receive food waste, garden waste, manures and other organic feedstocks from many suppliers. Sites operating under environmental permits must now report each feedstock load to Defra within 2 working days.

Digital waste tracking for anaerobic digestion means capturing each delivery with supplier, carrier, feedstock type, EWC code and weight at the gate, then submitting it automatically. Our app also helps you manage feedstock quality and certification records in the same place.

Every Feedstock Load Reported to Defra

Each delivery is ticketed at the weighbridge or gatehouse, with regular suppliers and feedstocks preset for speed. The app drafts the Defra record, checks it and submits it, tracking the deadline and flagging any rejections.

Feedstock Quality and Contamination Checks

Contamination, such as plastics and packaging in food waste, affects digestate and compost quality. The app records inspections, contamination levels and photos against each load and supplier, so you can manage contracts, apply charges and show regulators you're controlling inputs.

PAS Certification Records

Whether you work to PAS 110 for digestate or PAS 100 for compost, you need clear records linking inputs to outputs. The app records feedstock batches, processing and output, and produces the reports your certification body expects.

When AD and Composting Sites Must Comply

AD and composting sites operating under environmental permits are in Phase 1: mandatory from 1 October 2026 in England and Wales and 1 January 2027 in Scotland and Northern Ireland. Sites running under waste exemptions aren't in Phase 1, but are expected to come into scope in a later phase.

EWC Codes and Records for AD and Composting Sites

Common codes include:

20 01 08biodegradable kitchen and canteen waste
20 02 01biodegradable waste (garden and park waste)
02 02 03materials unsuitable for consumption or processing
02 01 06animal faeces, urine and manure

Always confirm codes against the official List of Wastes.

A Bespoke App for AD and Composting Sites

An AD or composting site app can include:

Gatehouse and weighbridge receipts

by feedstock

Supplier records

and contamination reporting

Feedstock batch and output tracking

PAS 110 / PAS 100 records

Animal by-product documents

where required

Automatic Defra digital waste tracking

From Paper to Digital Without the Headache

We'll set up your feedstocks, suppliers and certification needs and connect to your weighbridge, so your site team can keep receiving loads at speed.

Frequently Asked Questions

Yes, if they operate under environmental permits. Exempt sites are expected in a later phase.

Related

We don't sell boxes of software. We build the app your business actually needs.

Book a free, no-obligation demo and talk it through with someone who understands commercial waste management.

Book a free demo